fr | en

Location : Amiens - Poulainville

Year : 2007

Client : Gazeley

User : Procter and Gamble

Size : Two buildings of 74 000 m² total

This project is the largest the Gazeley-GSE-SAGL team have built so far, with two buildings of

74 000 m² total. It was built in six months.

The project was awarded the "prix de la performance energetique - developpement durable" in 2007 by ASLOG.


The environmental initiatives are as follow:

  • Photovoltaic panels for electricity production,
  • Solar panels for the offices’ hot water,
  • Rainwater re-use system,
  • 20 kW wind turbine
  • Glu-lam roof and offices structure,
  • Increased insulation to warehouse façades,
  • Waterless urinals.